top of page
金屬表面

Polyurethane Underlay

By normal condition (20°C/68°F) and 80 % RH) Herculan polyurethane underlay quickly attains a high surface strength and is walkable after 16-24 hours, depending of temperature. Final covering can be applied after 24 hours.

 

Note that the curing time depends on the substrate temperature and the ambient air temperature of the working area as well as the relative humidity. All Herculan Polyurethane Underlay products meet all requirements according to IMO FTP Code 2010 part 5.

PU Underlay-1.jpg
PU Underlay-2.jpg
PU Underlay-3.jpg

Let's Discuss 
Your Next Project

Fill out the form, or call us to set up a free consultation.

China:
Building B3, 288 Hang Zhou Road, Haimen District, Nantong, 226100, P. R. C

UAE:
House U2-030, Sharjah Airport International Free Zone Authority, Sharjah, P.O.Box 8000

+86 0513 83502203    +971 52 450 2546

Thanks for submitting!

logo Herculan 2022 wit.png
Marlon.png

© 2035 by M&B Remodeling. Powered and secured by Wix

  • facebook
  • twitter
  • youtube
bottom of page